Projects

Background

Recent Project

CONTRACT FOR THE PURCHASE AND DELIVERY OF 4 (FOUR) COMPLETE SETS OF CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) FOR FL, RB, LK AND PB (PT OKI PUPL & PAPER PROJECT – 2023)

  • Installation CEMS Direct Extractive Heated Gas Sampling System for FL Plants
  • Installation CEMS Averaging Pitot Tube for LK Stacks
  • Installation CEMS direct extractive dry & Unheated Gas sampling system for RB Stack
  • Installation Dust and Opacity Monitor with Durag D-R290 Gen2 for RB Stack
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance

PENGADAAN MERCURY EMISSION MONITORING SYSTEM UNIT 1 DAN UNIT 2 ( PT IP PLTU BANTEN 3 LONTAR OMU – 2023)

  • New Installation Direct Extractive – Mercury Analyzer Durag in 2 Stacks
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance and 2 years warranty

INSTALLATION OF CONTINUOS EMISSION MONITORING SYSTEM AND INTEGRATION TO MINISTRY OF ENVIRONMENT AND FORESTRY SISPEK APPLICATION (PT KRAKATAU OSAKA STEEL – 2023)

  • Installation CEMS Double Pass Transmissimetry Averaging pitot tube insitu Envea
  • Installation, Wiring modification, Testing & Commissioning, Training, Maintenance and 1 year warranty

Pengadaan Flame Monitor System (PT PRIAMANAYA ENERGI – PLTU KEBAN AGUNG – 2023)

  • Upgrade Flame Sensor to compact Flame Monitor 24 units for unit 2 and flexible fibre optic Durag
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 3 years Warranty)

PENGADAAN CEMS MERCURY PLTU AIR ANYIR BANGKA - 2023

  • New Installation Direct Extractive Dilution – Mercury Analyzer Envea
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 2 years Warranty)

PENGADAAN CEMS MERCURY (HG) DAN CO2 PLTU TENAYAN PEKANBARU – 2023

  • New Installation Direct Extractive Dilution – Mercury Analyzer Envea
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 2 years Warranty)

UPGRADE SYSTEM CONTINUOUS EMISSION MONITORING SYSTEM (PT INDO BHARAT RAYON – 2023) Gresik

  • Upgrade CEMS Direct Extractive Dry & Unheated Gas Sampling System to Envea Dilution
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 1 year Warranty)

PENGGANTIAN CEMS UNTUK RECOVERY BOILER #12-13 ( PT INDAH KIAT PULP & PAPER – 2023)

  • Replacement CEMS recovery Direct Extractive Dry & Unheated Gas Sampling System
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 1 year Warranty)

INSTALLATION DUST CONCENTRATION MEASURING SYSTEM (PT CIREBON ELECTRIC POWER – 2023)

  • Upgrade Dust and Opacity Monitor with Durag D-R290 Gen2
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 1 year Warranty)

PENGADAAN DAN PEMASANGAN GAS ANALYSIS SYSTEM MERCURY (HG) DAN INTEGRASI KE CEMS DAN SISTEM PEMANTAUAN EMISI ONLINE (SISPEK) TERPASANG ( PT MAKMUR SEJAHTERA WISESA – 2023)

  • New Installation Direct Extractive Dilution – Mercury Analyzer Envea for 2 stacks
  • Integrate the Mercury parameter to existing CEMS and connect to MoEF server (SISPEK)
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 1 year Warranty)

PENGADAAN CONTINUOUS EMISSION MONITORING SYSTEM (PT PUPUK SRIWIDJAJA – 2023)

  • Installation CEMS Direct Extractive Heated Gas Sampling System Double Pass Transmissimetry Envea (1 stack)
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 1 year Warranty)

PENGADAAN FLOWMETER GAS STACK STG & BB (PT PUPUK SRIWIDJAJA – 2023)

  • Installation Averaging Pitot Tube – Flowmeter Envea (1 Stack)
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance (technician daily visit for 1 year Warranty)

PENGADAAN PENAMBAHAN 2 UNIT CEMS UNIT LAYANAN PLTG MALEO DAN INTEGRASI DATA CEMS MELALUI DARING SISTEM EMISI SECARA KONTINU (PT PLN PERSERO UNIT INDUK PEMBANGKITAN DAN PENYALURAN SULAWESI-2023)

  • CEMS Direct Extractive Heated Gas Sampling System Envea (2 Stacks)
  • Kalibrasi CGA, RCA dan RATA
  • Uji konektivitas CEMS pada SISPEK KLHK
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance

PENGADAAN REHABILITASI CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) PLTG MPP DAN PENAMBAHAN MODULE MONITORING ( PT PELAYANAN LISTRIK NASIONAL BATAM – 2023)

  • Installation CEMS Direct Extractive, Averaging Pitot Tube, Electroda for 20 Stacks
  • Uji konektivitas CEMS pada SISPEK KLHK
  • Kalibrasi CGA, dan RATA
  • Installation, Wiring modification, Testing & Commissioning, Training, and Maintenance

Maintenance Project

2015 - nowPT. Cikarang Listrindo - Installation since 2011 Monthly CEMS Maintenance Service
2016 - 2019PLTGU Grati - Installation since 2006 CEMS Maintenance Routine
2016 - nowPLTU Suralaya Unit 2 - Installation since 2012 CEMS Maintenance Routine Unit 1-4
2016 - nowPLTU Indramayu - Installation since 2015 CEMS Maintenance Routine
2017 - nowPLTU Paiton Unit 1 & 2 - Installation since 2011 CEMS Maintenance Routine with CEMSitting, after 5 years warranty
2017 - nowPLTU Labuhan Angin - Installation since 2015 CEMS Preventive Maintenance
2017 - nowPLTGU Muara Karang Blok I - Installation since 2018 CEMS Maintenance under warranty
2018 - nowPLTG Paya Pasir - Installation since 2015 CEMS Maintenance Routine
2018 - nowPLTU Pacitan - Installation since 2017 CEMS Maintenance under warranty
2018 - nowPT. Bukit Muria Jaya - Installation since 2005 & 2017 CEMS Maintenance Routine
2018 - nowPT. Tjiwi Kimia - Installation since 2014 CEMS Maintenance Routine
2019 - nowPLTGU Muara Karang Blok II - Installation since 2018 CEMS Maintenance under warranty
2019 - nowPLTU Ombilin Unit 2 - Installation since 2011 CEMS Maintenance Routine with CEMSitting
2019 - nowPT Cakra Tunggal Steel Mills - Installation since 2011 CEMS Maintenance Routine
2020PLTU Bukit Asam - Installation since 2015 CEMS Maintenance Routine
2020PT. IP PRO POMU Blok 3 & 4 - Installation since 2013 Dust monitor maintenance routine
See More Project